Shoscombe WRC required upgrades across both AMP7 and AMP8. Instead of treating these as separate schemes, the programmes were merged and delivered by a single integrated team. This
eliminated duplicate mobilization costs, reduced disruption and ensured continuity from design through commissioning.
The combined programme successfully met all AMP7 and AMP8 permit requirements